The purpose of drainage pipes is to expel the discharge coming out from the home and direct it into the septic or sewer tanks. In sewer systems from houses, pipes are laid in between inspection chambers. This drainage setup must be self-cleaning, with running wastewater doing the flushing. Correct gradients are used for this purpose. Drain lines mostly comprise of UPVC tubing. It is essential to test the drainage system properly before allowing its use. This should be done between the inspection chambers.

The laying down of drainpipes should be done in indents in the ground. The standard trench depth that is used is between three hundred and five hundred millimeters. Concrete casing is required for the system when it is laid below a parking area, walkway or driveway. To begin laying the lines, first excavate the trenches to the necessary depths. The grading must be done near the sewers or the tank. Maintain a one to four ratio for the slope you create. Ensure that the bottom of every trench is well rammed to get a uniformly compacted surface. Fix pegs at the base of each trench to set the required levels.

Set drain pipes straight and directly in line with one another. When the pipes have to be fixed on a slope or towards the building, join the sections with sockets. An even and solid ground is required for laying the system throughout its length. Male and female sockets should be used to join the pipes using a good adhesive. Read the instructions that come with the adhesive carefully and make sure that all of them are followed well. The pipe should be thickest in the area where it is being connected to the inspection chambers. Keep debris off the pipes.

Inspect and scrutinise the drainage pipes while laying them. Make sure that they are not punctured at any point. All socket recesses have to be adequately formed in the foundation. In addition, their length should be kept to a minimum. The inlet and outlet of the inspection chamber must be even and ordered. The system is then covered with soil after all joints are complete. Make the final connections to the sewer or septic tank. Complete the drainage system by connecting the utilities and test the full system.